2nd April 2023
So, the last few days since my birthday have been a manic whirlwind of jobs that needed doing around the house with a few hours of leisure thrown in as well.
We have......
- made several A-Frames to support a sloping roof and installed it to keep the covered veranda and the bathroom ceilings dry.
- installed guttering around 2/3 of the house, the final 1/3 will be completed when we get the last few pieces we need.
- started to block up the holes around the skirting boards and floorboards to stop the rodents and put down rat poison
- made the frames for mosquito window screens, just need to staple the fabric onto the frame.
- started making a 3-bin compost system out of pallets
- chopped trees and pruned grape vines, chopped logs and stored them in a dry shed and then dragged the remainder to burn
We have had some downtime too ......
- we have walked up to the waterfall twice, once on our own and once with a new friend.
- met more new friends for dinner in Coimbra.
- eaten out a couple of times at our local veggie restaurant.